It's a bright spring morning here in East Sussex and I'm walking into town for an early lunch. It occurs to me that someone should be walking toward a brighter future for Wales too.


The Wrong Conversation

The closure of Port Talbot’s blast furnaces in 2024 was framed, almost universally, as a tragedy to be managed. A £500 million government package. Retraining schemes. Transition funds. The language of bereavement rather than strategy.[^1]

This framing is wrong — not because the human cost isn’t real, but because it starts from the assumption that Port Talbot’s value was the blast furnace. It wasn’t. The value is everything else: the deep-water port, the grid infrastructure, the land, and — for a closing window — the people.

The question worth asking isn’t how we soften the closure. It’s whether we’re looking at one of the best-configured sites in Western Europe for a new kind of steel production, and failing to see it.


Why Conventional Steel Is a Dead End

To understand the opportunity, you first have to understand why trying to save the blast furnaces was always a losing proposition.

Basic oxygen steelmaking — the process Port Talbot used — is structurally dependent on coal-derived coke and iron ore, and produces approximately 1.8 tonnes of CO₂ per tonne of steel.[^2] It competes on volume and cost. And on cost, it cannot win.

China produces roughly 1 billion tonnes of steel per year — over half of global output — much of it with state subsidy and without the environmental compliance costs carried by UK producers.[^3] The steel dumping concern is not hypothetical; the EU and US have both imposed tariffs in direct response to Chinese overcapacity flooding global markets.[^4] The UK, post-Brexit, has been slower to respond and more exposed.

Competing in this market by saving a blast furnace with government subsidy is not industrial strategy. It is expensive delay.


The Alternative: Electric Arc + SMR

Electric Arc Furnace (EAF) steelmaking is a fundamentally different process. Instead of smelting iron ore with coke, it melts recycled steel scrap using high-voltage electric arcs. Carbon emissions are determined almost entirely by the electricity source — UK grid average EAF steel produces around 0.4 tonnes CO₂ per tonne, and with zero-carbon electricity, that approaches zero.[^5]

EAF is already the dominant steelmaking technology in the United States (around 70% of production) and is growing globally.[^6] Tata’s own transition plan at Port Talbot involves an EAF — but powered by grid electricity whose carbon content and price remain variable and subject to political risk.

Here is where Small Modular Reactors change the equation entirely.

An SMR co-located with an EAF facility provides:

Rolls-Royce SMR, the UK’s leading candidate, targets an output of 470 MWe per unit with a projected levelised cost of electricity competitive with offshore wind on a like-for-like basis — crucially, without intermittency.[^7] An EAF facility of Port Talbot’s scale would require substantial but not impractical electrical supply; multiple SMR units would provide both the primary power and significant surplus for grid export as a secondary revenue stream.


Why Renewables Cannot Do This Job

At this point, a reasonable objection arrives: why not simply power the EAF with offshore wind? Wales has excellent wind resource. The UK has world-leading offshore capacity. Isn’t this exactly what renewables are for?

The answer is no — and understanding why matters, because it pre-empts the most common dismissal of the SMR proposal as unnecessary.

An Electric Arc Furnace is not like a data centre or a supermarket. It does not draw steady, manageable power. A modern large-scale EAF pulls somewhere between 100 and 400 megawatts in sharp, aggressive cycles as scrap charges melt and the arc stabilises across successive heats. The load profile is characterised by sudden massive demand spikes followed by partial drops, then spikes again — repeated continuously across a 24-hour operation. It is, from a grid management perspective, almost pathologically difficult power demand.[^12]

This matters because intermittent generation and battery storage fail against this requirement on multiple independent grounds.

The battery degradation problem. Lithium-ion chemistries degrade fastest under precisely the conditions an EAF imposes: deep cycling at high discharge rates, continuously and repeatedly. A battery bank sized to buffer EAF load swings would be operating at the worst possible point of its performance envelope, accelerating degradation and compressing the replacement cycle. Flow batteries handle cycling more gracefully but carry prohibitive cost and footprint at EAF scale. To store even eight hours of supply for a 400MW furnace requires approximately 3,200 MWh of battery capacity — at current installed costs, well over £1.5 billion in storage infrastructure alone, degrading from day one.[^13]

The availability problem. The UK capacity factor for offshore wind is approximately 40% — meaning averaged across the year, turbines produce 40% of their nameplate rating. For solar generation in South Wales the annual figure is closer to 10-12%. These averages conceal the operationally relevant problem: correlated low-production periods. Winter anticyclones bring extended spells of cold, still, overcast weather — lasting days or weeks — that simultaneously suppress both wind and solar output across wide geographic areas. No feasible battery installation bridges a two-week wind drought for a 24-hour industrial process. You shut the furnace down.[^14]

The cost of shutting the furnace down. An EAF is not a light switch. Thermal cycling of the refractory lining — the high-temperature ceramic interior — causes cumulative stress and dramatically shortens its operational life. Unplanned or weather-driven shutdowns are not neutral events; they are expensive ones, both in direct refractory damage and in lost production from a facility carrying enormous fixed capital costs.

What SMR provides instead. Nuclear capacity factors run at 90-93% — not because of engineering heroism, but because the fuel is energy-dense, the process is stable, and weather is irrelevant. The power output is continuous and controllable. Modern SMR designs including Rolls-Royce’s offer genuine load-following capability, meaning output can be modulated to track the EAF’s demand cycle rather than requiring the steelmaking process to contort itself around the generator.[^15]

This is the correct framing for the energy source question: not carbon intensity alone, but fitness for purpose. Renewables are genuinely excellent for many applications. Powering a continuous heavy industrial process with violent load swings is not one of them — not today, and not on any credible storage technology horizon.

The SMR is not chosen despite renewables being available. It is chosen because the engineering requirements of the process make it the only viable zero-carbon option.


The Nuclear-Grade Market: Where China Cannot Follow

The more important strategic insight is not just the carbon credentials — it’s the product tier.

Nuclear-grade steel is a specialised category. Reactor pressure vessels, containment structures, and primary circuit components require steel with extremely tight compositional tolerances, full traceability from melt to final product, and certification under standards including ASME Section III (US), RCC-M (France/Europe), and UK national nuclear safety frameworks.[^8]

This market is:

The UK’s nuclear programme — Hinkley Point C, Sizewell C, and the SMR pipeline itself — represents a captive domestic demand for exactly this material. The current situation is that much specialist steel is imported, often from France (Creusot Forge) or Japan (Japan Steel Works), with lead times and geopolitical exposure that the nuclear industry finds increasingly uncomfortable.[^9]

A UK-based EAF facility, powered by SMR electricity, producing nuclear-certified steel for the UK’s own reactor programme, operating on a site with existing port infrastructure to receive scrap and ship product — this is a supply chain loop that largely closes on itself.

This is the market China cannot enter regardless of price, because the barrier is certification, traceability, and geopolitical acceptability, not cost.


Port Talbot: An Asset Inventory

Seen through this lens, Port Talbot is not a casualty. It is a pre-configured asset:

Deep-water port: The harbour can handle Capesize and Panamax vessels. Iron ore and coal came in at scale for decades. Scrap steel — the EAF feedstock — can come in through the same infrastructure. Finished product goes out the same way.[^10]

Grid connection: The site has heavy industrial grid infrastructure already in place, sized for blast furnace loads. This is not trivial — securing a new grid connection for a major industrial facility takes years and carries substantial cost. Port Talbot’s existing connection is an inherited asset of significant value.

Land: The brownfield footprint is substantial. An SMR requires a relatively compact installation compared to a traditional nuclear station; an EAF steelworks is similarly space-efficient relative to blast furnace and coke oven infrastructure. The site can accommodate both.

Planning context: Welsh Government and the local authority have strong incentives to support industrial reinvestment on the site. Brownfield designation, existing industrial use class, and political pressure all point toward facilitative rather than obstructive planning posture.

Workforce: This is time-critical. The metallurgical workforce — furnace operators, quality engineers, process specialists — is currently dispersing. Some will retire. Some will retrain into other sectors. The window for capturing that institutional knowledge is roughly three to five years. After that, it must be rebuilt from scratch, which takes a generation.


The Startup Case

This proposal does not require a government programme. It requires a corporate vehicle with a long time horizon and access to capital — characteristics more naturally found in infrastructure-oriented private equity, sovereign wealth, or a consortium of industrial and energy interests than in a FTSE-listed manufacturer optimising for quarterly earnings.

The capital requirement is substantial — SMR deployment at commercial scale plus EAF installation is a multi-billion pound programme. But the revenue model is robust:

The certification timeline for nuclear-grade production is the longest lead item — typically five to seven years from facility commissioning to first nuclear-qualified heat.[^11] This argues for starting immediately, not for waiting.


The Political Economy

None of this is technically difficult. The obstacle is coordination and will.

The Rolls-Royce SMR programme needs anchor customers to derisk its own financing. A captive industrial co-location would be structurally valuable to that programme. The UK nuclear industry needs domestic steel supply. Welsh Government needs a Port Talbot story that isn’t managed decline. The Ministry of Defence — a significant consumer of certified steel for naval construction — has latent interest in supply chain sovereignty.

These interests are not in conflict. They are not even particularly far apart. What they lack is a single integrating proposal that names the site, names the technology, and does the arithmetic.

This is that proposal, in outline. The arithmetic works. Someone should do it properly.


What Needs to Happen

  1. A site feasibility study for SMR co-location at Port Talbot, commissioned jointly by DESNZ and Welsh Government, against an explicit brief that includes EAF steelmaking as the primary industrial load.

  2. Rolls-Royce SMR to engage Port Talbot as a priority candidate anchor site in its commercial development programme.

  3. A workforce retention programme — not retraining for other industries, but a structured scheme to keep metallurgical expertise attached to the site on a retainer or transition basis while the investment case is assembled.

  4. A nuclear supply chain certification programme initiated now, so that by the time an EAF facility is commissioned, the qualification pathway is already under way rather than starting from zero.

  5. A cross-departmental funding vehicle — potentially building on the existing ATIP (Advanced Technology and Innovation for Production) frameworks — that treats Port Talbot as a national industrial asset rather than a regional closure problem.


Conclusion

The choice is not between saving the blast furnaces and managing decline. That choice has already been made, and it was probably the right one.

The real choice is between allowing Port Talbot to become a brownfield memory, or recognising that the site’s infrastructure, location, and — for now — its people represent a configuration that would take decades and billions to recreate anywhere else.

SMR-powered EAF steelmaking, targeted at nuclear-grade and high-specification markets, on the Port Talbot site, is not a fantasy. It is an engineering proposal with a coherent commercial logic, a captive customer base, and a geopolitical context that makes it more relevant by the month.

It will, no doubt, require more capital than we expect, a SMR can’t be deployed rapidly enough to secure the metallurgical workforce unless you keep them hired before it’s deployed, the likes of Creusot Forge, and Japan Steel Works won’t sit still but we need to be thinking about our industrial strategy now. There’s a window, it’s open now, but it won’t stay open.


References

[^1]: UK Government, Port Talbot Steel Transition Fund, November 2023. https://www.gov.uk/government/news/government-support-for-port-talbot-steel-workers

[^2]: World Steel Association, Steel’s Contribution to a Low Carbon Future, 2023 Statistical Yearbook. https://worldsteel.org/steel-topics/environment-climate-change/

[^3]: World Steel Association, World Steel in Figures 2024. China produced approximately 1,019 Mt in 2023. https://worldsteel.org/steel-topics/statistics/world-steel-in-figures/

[^4]: European Commission, Anti-dumping measures on steel products from China, 2023. https://trade.ec.europa.eu/access-to-markets/en/content/steel-anti-dumping

[^5]: Electric Power Research Institute, Comparison of Greenhouse Gas Emissions from Different Steelmaking Routes, 2022.

[^6]: American Iron and Steel Institute, Profile 2024: Steel Industry Statistics. EAF share of US production approximately 70%. https://www.steel.org/

[^7]: Rolls-Royce SMR Ltd, SMR Programme Overview, 2024. Quoted LCOE target: £50–60/MWh. https://www.rollsroyce.com/innovation/small-modular-reactors.aspx

[^8]: International Atomic Energy Agency, Quality Assurance for Nuclear Power Plants — Requirements for Nuclear Grade Steel, IAEA-NS-G-1.14.

[^9]: UK Parliament, Nuclear Supply Chain Resilience, House of Commons Energy Security and Net Zero Committee, 2023.

[^10]: ABP (Associated British Ports), Port Talbot Harbour, operational specifications. https://www.abports.co.uk/our-ports/wales/port-talbot/

[^11]: Nuclear Industry Association, UK Nuclear Supply Chain Capabilities Report, 2022. Certification timelines for new nuclear-grade material producers typically 5–7 years.

[^12]: Kirschen, D. et al., Power System Aspects of Electric Arc Furnace Operation, IEEE Transactions on Power Systems, 2019. EAF load characterised as one of the most disruptive industrial loads on distribution networks due to rapid, large-amplitude fluctuations.

[^13]: BloombergNEF, Energy Storage Market Outlook 2024. Utility-scale lithium-ion installed cost approximately £400-500/kWh; flow battery cost premium 30-50% with better cycle durability. Degradation under high C-rate deep cycling materially reduces usable capacity within 3-5 years.

[^14]: National Grid ESO, Capacity Factor Data for UK Renewable Generation 2023. Offshore wind average capacity factor 38-42%; UK solar 10-13%. Extended anticyclonic periods documented as multi-day correlated suppression events across both technologies simultaneously.

[^15]: Rolls-Royce SMR Ltd, Technical Specification Summary, 2024. Quoted capacity factor >90%; load-following ramp rate 3% per minute from 20% to 100% power, compatible with EAF demand cycle management.


I write on industrial strategy, technology and national security.

Feedback and challenges welcome. The Steelman is in the comments.

Comments for this piece live on Substack.

Discuss on SubstackSubscribe